DSCN0474

General contractor: “SK-Kulager" Llp. 

Location: Astana, left bank of the Ishim River 

Put into operation - 2009  

Area - 40 000 sq.m. 

Equipment: AHU VBW Engineering (17),  exhaust air systems Salda.

Our services: ventilation

Produced and installed ducts -12000 sq.m.