23

General contractor: «GMT  EngineeringLTD»»

Location: Orynbor str.,  Astana

Plan to put into operation - 2014

Area - 78300 sq.m.

Our services: HVAC.

Equipment:

  •   AHU,  Juwent (26),
  •   precision air conditioning systems, Clivet (20),
  •   fan coils, Clivet (16),
  •   chilled beams (520),
  •   chillers, Clivet (5).

Produced and installed ducts -– 24449 sq.m.